‚ÄčTri-State Generator Alliance

The 5 Stages of Analysis For Generator Projects


  1. Needs assessment to understand your goals and objectives.
  2. In depth site inspection to identify electric demands, fuel source, generator pad placement, site conditions, access, electric and gas length of run to the generator. 
  3. Generator system design based on your objectives, site conditions, and budget.
  4. Detailed system proposal identifying very clearly what the system is designed to do, where it will be located, the length of the electric and fuel runs, the equipment required, and any other specific information relative to your project.
  5. System design and proposal Q&A to make sure we are on the same page and make any required modifications. This is good time to discus warranty administration, parts availability, and preventative maintenance.